You are here:Home > Assembly Instructions > Step #3 Attach drawer fronts to the drawer boxes


1. Apply the Blum locking devices to the underside of the drawer box as shown below using the 5/8" long hinge screws.

attach locking devices to the drawer box


2.  Identify whether this drawer box is going to be a Top Drawer, Middle Drawer, or a Bottom Drawer. See the pictures below for further explanation. Place the drawer front face down on a flat surface. Locate the appropriate mounting holes on the back side of the drawer front.top and middle drawer fronts
bottom front mounting holes


3. Take the corresponding drawer box and locate the drawer front mounting holes drilled at the front of the drawer box. Use the "drawer front mounting screws" to securely fasten the drawer box to the drawer front.  drawer box mounts to teh drawer front
 
drawer front mounting screws

4. All done, your drawer box is ready to be installed into the cabinet.
mounted drawer box and front in a cabinet

Mount drawer fronts to the drawer box:


Attach locking devices to the bottom of the drawer box: